How To Install Tar Paper On A Roof

How To Install Tar Paper On A Roof

Install-a-Steel-Roof-Step-2.jpg/aid1377945-v4-728px-Install-a-Steel-Roof-Step-2.jpg' alt='How To Install Tar Paper On A Roof' title='How To Install Tar Paper On A Roof' />How to Roof a House. Can you do it yourselfMake no bones about itroofing is hard work. Theres no hiding from the elements. You cant be afraid of heights and you need to be pretty fit. Before committing to this project, try this Get out a ladder and climb up onto your roof. If you cant walk around on it comfortably, hire a pro. If you passed this first test, go to the lumberyard or home center and throw a bundle of shingles onto your shoulder. Imagine yourself carrying that load up aladdermany, many times. If youre still feeling positive at this point, why not give it a shot You can skip a lot of heavy lifting by having your roofing supplier hoist the shingles onto the roof. Be sure you spread the load evenly across the length of the roofs peak. Xt4WBbKFhs/hqdefault.jpg' alt='How To Install Tar Paper On A Roof' title='How To Install Tar Paper On A Roof' />However, dont have the shingles delivered to the roof if you have two layers of old shingles yet to tear offit could be too much weight for your trusses. After youve obtained a permit if needed and safely stripped the roof clean, nail drip edge flashing flush alongthe eave. Windblown heavy rain andor snow can force water up and under even properly installed shingles. Even worse are ice dams frozen watersnow that builds up on roof edges, which can wreak havoc by allowing water to seep up under lower shingles and then drip into your house. To guard against such seepage, apply self adhesive waterproof underlayment ice barrier, which adheres tightly to bare roof sheathing and seals around nails driven through it. Buy it at roofing supply companies or home centers. In severe climate regions, most building codes require applying it 3 to 6 ft. Call your building inspector for local details. How To Install Tar Paper On A Roof' title='How To Install Tar Paper On A Roof' />Cover the rest of the roof with No. No. 3. 0. Each layer overlaps the lower one by at least 2 in. Follow this step by nailing drip edge along rakes sides of roof, on top of the underlayment. As you did with the flashing, always lap upper pieces over lower pieces. Heres a house much fancier than mine, showing off its metal roof image credit Metal Sales Inc. Installing a new flat roof or repairing your existing flat roof in the winter is possible there are a few things to know before you decide to go ahead. It is a great. Edit Article wiki How to Install Metal Roofing. Two Methods Readying Your Roof Installing Your Roofing Community QA. Metal roofing is becoming very popular because. Provides service and products for roof restoration and durability. Lists vendors, company background and contacts. The felt keeps the roof deck dry before shingles go on, protects against wind driven rain as shingles fail and increases fire resistance. Next, find the center of the roof at the top and the eave, then snap a vertical chalk line. Most pros use this line to begin shingling, working left and right toward the rakes. Shingle manufacturers may recommend starting at the left rake edge, so check package recommendations. For the first row of shingles, called a starter course or strip, you cut the tabs off three tab shingles and apply them with the self sealing adhesive strip facing up along the eave. Make sure this row has a slight overhang 14 to 38 in. The starter course protects the roof by filling in the spaces under the cutouts and joints of the next row first course of shingles. The adhesive on the starter course seals the tabs of the first full course. Finally, nail the first course of shingles directly on top of and flush with the starter course. Use four roofing nails per shingle, as indicated on package instructions six nails in high wind areas. Once this course is laid, you can begin snapping horizontal chalk lines up the roof to ensure straight rows. Make sure to expose 5 in. Tear off the old. Its impossible to properly install new flashing and underlayment if you dont tear off the old roof beforehand. When tearing off the existing shingles, be sure to remove all the old nails or pound them flat. Protruding nails will tear holes in your new shingles. If you have movable items near your house and youre worried they might get damaged, relocate them. Invest in a few large tarps to protect your plants and landscaping and to catch the thousands of nails that will rain down off the roof. It can be downright impossible to remove old self stick ice and water underlayment, but its OK if you have to leave it in place. And if at all possible, have the rented trash bin parked close to the house so you can toss in the old shingles right from the roof. For more information, see. How to Tear Off Roof Shingles. Figure A Roofing Overview. This cutaway drawing shows the steps involved in roofing a house. Figure A Roofing overview. Install the drip edge. Metal drip edge isnt usually required check with a local building official, but it gives roof edges a nice finished look, prevents shingles from curling over the edge, and keeps water from running directly down your fascia boards. How To Install A Metal Roof On Gambrel Shed Wood Dining Table Design Plans How To Install A Metal Roof On Gambrel Shed Bunk Beds With Stairs Plans License Plate. Before you install the underlayment, fasten the drip edge that covers the fascia on the eaves. The whole length of the fascia is probably not perfectly straight, so dont snap a line just hold the drip edge snug against the fascia and fasten it through the top into the decking with roofing nails. Nail it every couple of feet. Install the drip edge on the gable ends of the roof after you finish installing your underlayment. Start at the bottom side of the gable, and overlap the sections of drip edge a few inches as you work your way up the roofsee Figure A. Use a tin snips to cut the drip edge to size. Stay Safe. When it comes to roofs, even the best safety equipment is no substitute for common sense and good judgment. Here are some tips for working safely on a roof Leave steep andor high roof work to the pros. No amount of money you could save is worth the risk of death or a lifelong disability from a fall. A fall protection kit harness, rope and hook only costs about 1. Wet roofs are slippery. Wear shoes with soft rubber soles for extra traction. Keep the roof swept clean of dirt and debris. Everyone on the ground should wear a hard hateven the most careful worker can drop a tool off the roof. Always look and call out before tossing anything down. Carefully position ropes and extension cords so theyre not underfoot. Check the weight rating on your ladderit needs to hold you plus 8. Extend the top of the ladder at least 3 ft. Never step on any of the ladder rungs above the roof. Set up scaffolding to install the drip edge and first few courses. Roll out the self stick underlayment. Photo 1 Stick on the underlayment. Protect the roof against ice dams and windblown rain with self stick ice and water underlayment. Peel off the top half of the plastic backing as you unroll the underlayment. Photo 2 Peel off the bottom backing. Make sure the underlayment lies smooth before you nail the top edge. Then pull off the lower half of the backing. Stick the bottom part of the underlayment to the roof of the house. Install the second course just like the first, using the guidelines on the underlayment to get the correct overlap. When an ice dam forms on a roof usually caused by poor attic insulation ventilation, ice and water can work their way up under the shingles and leak back into the house. Also, strong winds can blow rainwater under shingles. Self stick roofing underlayment often called ice and water underlayment can prevent this because it sticks to the roof decking to seal out water. It also seals around nails, which keeps water from leaking through nail holes. Rolls of self stick underlayment have a plastic backing so the material wont stick to itself. The backing is separated down the middle. Line up the lower edge of the roll with the outside of the drip edge. Peel back part of the uppermost backing on the roll, and nail the top corner of the underlayment to the decking. Start pulling the roll across the decking using the backing, making sure the material is lying as flat and as straight as possibleas you pull. How To Properly Install Roofing Felt at Roofing. Felt. org. Once you understand what it does, and you know which one you need, you are ready to lay the underlayment for your roof. But, as with so many other projects, the key lies in the prep work. If you take the time to properly prepare the roof, then laying the felt will be easy. On the flipside, if you rush through the initial steps, the felt installation can be compromised by sloppy oversights such as stray nails. Of course, if you find yourself overwhelmed by the planning, preparation, or execution, you can reach out to professionals in your area. Prep Work Check the weather. Ideally, the roof should be done when there is a forecast for several days without a lot of rain. The roof decking should be completely clean and dry. Any stray roof tacks, pieces of old felt, or general debris should be cleared off. Running a flat bottom shovel along the roof decking will help you find any stray nails that should be pulled. Wood splinters should also be pulled out for a smooth, clean decking surface. This step is vital to the success of your new roof and must not be shortchanged in any way. Before laying roof felt, all rotten decking must be replaced. Drip edges on the eaves, any valley liners and all flashing should be installed before the tar paper is laid. Chalk lines should be snapped 3. After this, lines should be snapped every 3. Decorating With Old Windows And Doors there. Have a helper ready to assist with this step, and take care to get the lines straight and clean. Laying the Felt. The roofing felt should be applied in layers that overlap. Start at the bottom of the roofline and work up so any water that gets through the roofing material will shed down the tar paper and will not go under it. As you work, the paper can be tacked down in the center so it wont blow away. When you arrive at the rake, the paper should be cut flush with a knife and then adjusted to line up with the chalk line. The overhang to the next strip should be 38 inch. The paper should then be nailed in or stapled every three to four inches across. All nails and staples should be placed on the lower half of the paper. Where a roll ends and a new one is begun, the two rolls should be overlapped by four inches. Valley, ridges and hips should have a 6 inch overlap of paper. Paper can be fitted around vent pipes by cutting a slit and then putting it over the pipe. Before securing the end of a row, take time to walk the row, smoothing out any rough spots and matching up the snapped chalk lines. Smooth application of the roofing paper will help you achieve a smooth installation of the shingles. Be sure the tar paper lies in flat strips that are absolutely smooth. There should be no wrinkles or other spots that could catch moisture and cause problems. The overlap of 38 should be followed consistently for a smooth look once the shingles are installed. Some roofing felts are actually glued down. These applications are ideal for flat roofs or protective surfaces under roof level decks. These thick layers of roofing felt are installed by heating the back of the felt with a butane torch and then carefully applying it to the roof. Installing the roofing felt does take care, but can go very quickly. Taking the time to properly prepare the sheathing will make all the difference in how quickly and easily the felt paper is installed. The actual process of putting down the underlayment will be one of the fastest parts of the entire roofing process. Tips and Techniques. Check the requirements for the roofing material that will go over the felt. Some materials require heavier felt paper. Never mount the felt paper on wet sheathing. Mold and mildew will result and you could wind up having to rip off the roof and install a new one. Dry sheathing and felt paper also help ensure a watertight roof in severe climates. Strips should always lay flat. Uneven strips and wrinkles can allow dust, moisture and mold to develop. Sheathing that gets wet before the roofing material can go on should be allowed to dry thoroughly before continuing. Typically 2 to 3 days will be required for this. Tools and Supplies. A tape measure and chalk line are needed for snapping the guidelines on the roof. Two or more people are required to help roll out and straighten the paper during the process. A nail gun can be used to quickly install some nails to the roofing paper wont slide around. Follow manufacturers instructions when choosing nails.

How To Install Tar Paper On A Roof
© 2017